Working with landscape maintenance contractors
[edit] Introduction
A well-designed and maintained landscape can attract people to a site and can have a positive impact on property value and personal wellbeing. With more elaborate landscaping, it is fairly common for facilities managers or other property management professionals to outsource maintenance responsibilities to a company that specialises in grounds maintenance.
[edit] Preparing a contract
As is the case with other specialist contractors, it is important to include essential information in tender documentation, such as:
- Identification of the parties involved, addresses, names, licenses, qualifications, insurance and so on.
- Services offered, including specifics that are agreed upon as well as those being excluded. Some examples include:
- Core tasks such as grass cutting, turf, hedge, tree and bed maintenance, maintenance, removal and disposal of landscaping waste and so on.
- Optional tasks such as replacement of trees, bulbs, hedges, shrubs and so on (including the design and maintenance of replacement bedding schemes, if necessary).
- Seasonal planting and cleanup schedules.
- Clarification regarding damage to property (including irrigation systems that may be used).
- Agreements regarding maximum and minimum height levels for grass, grass edging and hedges and other landscape elements.
- Requirements for maintenance and monitoring of moisture detection systems (to ensure irrigation systems do not activate when it’s unnecessary).
- Special environmental concerns (such as schools or other sensitive adjacent areas or ecosystems to be protected from pesticides, fertilisers or pest control measures).
- Notification procedures and documentation for application of any potentially harmful chemicals (such as pesticides).
- Inclusion (or exclusion) of car park maintenance, and tasks such as ice removal or other safety issues.
- Inclusion (or exclusion) of specific activities such as weed control, mulching, leaf collection and removal and so on.
- Equipment storage.
- Procedures for reporting and dealing with vandalism.
- Arrangements when safety restrictions or exclusion zones must be put in place (particularly when landscaping work requires the placement of safety barriers).
- Fees (typically for work completed), including payment plans and form of payment.
- Key dates, including start and finish dates.
- Arrangements regarding access to locked or restricted areas.
It is also helpful to have an inventory of trees, shrubs and other types of landscaping on the site. In order for the list to be suitable for the contract specifications, it should include details such as size, age, condition and maintenance requirements of each item.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.

























